{"id":5872,"date":"2019-05-03T15:44:13","date_gmt":"2019-05-03T15:44:13","guid":{"rendered":"https:\/\/www.aib.media\/?p=5872"},"modified":"2019-05-03T15:47:35","modified_gmt":"2019-05-03T15:47:35","slug":"burkina-50-mw-attendus-dici-mi-mai-pour-affronter-les-delestages","status":"publish","type":"post","link":"https:\/\/www.aib.media\/?p=5872","title":{"rendered":"Burkina\u00a0: 50 MW attendus d\u2019ici mi-mai pour affronter les d\u00e9lestages"},"content":{"rendered":"<p><strong>Burkina-Energie<\/strong><\/p>\n<p><strong>\u00a0Burkina\u00a0: 50 MW attendus d\u2019ici mi-mai pour affronter les d\u00e9lestages<\/strong><\/p>\n<p><strong>Ouagadougou, le 03 mai 2019 (AIB)-Le Premier ministre Christophe Dabir\u00e9 a exhort\u00e9 vendredi, \u00a0la soci\u00e9t\u00e9 \u2018\u2019AGGREKO\u2019\u2019 \u00e0 acc\u00e9l\u00e9rer la fourniture des 50 MW d\u2019ici mi-mai, afin d\u2019amoindrir les d\u00e9lestages.<\/strong><\/p>\n<p>Le Premier ministre burkinab\u00e8 Christophe Dabir\u00e9 a effectu\u00e9 dans la matin\u00e9e du vendredi 03 mai 2019, une visite sur le chantier d\u2019une \u00a0centrale thermique (50 MW), tenue par la soci\u00e9t\u00e9 AGGREKO \u00e0 Ouagadougou, d\u2019un co\u00fbt de 50 milliards de FCFA.<\/p>\n<p>\u00abJe suis tr\u00e8s fier de voir que le travail a beaucoup avanc\u00e9. Nous avons connu quelques petites difficult\u00e9s de d\u00e9marrage parce que nous attendions la mise en r\u00e9seau \u00e0 partir du fin avril. Mais je pense que d\u2019ici le 15 mai, on devrait pouvoir avoir quelque chose qui va permettre de renforcer le potentiel de production de la SONABEL et contribu\u00e9 ainsi \u00e0\u00a0 amoindrir les d\u00e9lestages\u00bb, a d\u00e9clar\u00e9 le Premier ministre.<\/p>\n<p>Selon Christophe Dabir\u00e9, c\u2019est une solution qui vient renforcer les options politiques prises avec le pr\u00e9sident du Faso Roch Kabor\u00e9,\u00a0 en plus des interconnexions avec\u00a0 la C\u00f4te d\u2019Ivoire (80MW) et le Ghana (100MW).<\/p>\n<p>M. Dabir\u00e9 a par ailleurs f\u00e9licit\u00e9 la soci\u00e9t\u00e9 \u2018\u2019AGGREKO\u2019\u2019 pour le travail fait et surtout pour l\u2019utilisation des ressources humaines nationales.<\/p>\n<p>\u00abL\u2019ann\u00e9e pass\u00e9e nous avions un d\u00e9ficit de pr\u00e8s de 100MW et il \u00e9tait donc n\u00e9cessaire de faire quelque chose pour faire face \u00e0 la canicule\u00bb, a indiqu\u00e9 le ministre de l\u2019Energie Bachir Isma\u00ebl Ou\u00e9draogo.<\/p>\n<p>Il a rappel\u00e9 que d\u2019autres investissements sont en chantiers tels que les centrales de Kossodo (50MW) et de Ouaga-Est (150MW).<\/p>\n<p><strong>Agence d\u2019Information du Burkina<\/strong><\/p>\n<p><strong>ad\/adi<\/strong><\/p>\n<p><strong>Photo: Primature<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Burkina-Energie \u00a0Burkina\u00a0: 50 MW attendus d\u2019ici mi-mai pour affronter les d\u00e9lestages Ouagadougou, le 03 mai 2019 (AIB)-Le Premier ministre Christophe Dabir\u00e9 a exhort\u00e9 vendredi, \u00a0la soci\u00e9t\u00e9 \u2018\u2019AGGREKO\u2019\u2019 \u00e0 acc\u00e9l\u00e9rer la fourniture des 50 MW d\u2019ici mi-mai, afin d\u2019amoindrir les d\u00e9lestages. Le Premier ministre burkinab\u00e8 Christophe Dabir\u00e9 a effectu\u00e9 dans la matin\u00e9e du vendredi 03 mai [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":5873,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","footnotes":"","jetpack_post_was_ever_published":false},"categories":[173,37,93,203,83],"tags":[],"class_list":["post-5872","post","type-post","status-publish","format-standard","has-post-thumbnail","category-depeches","category-economie","category-flashinfos","category-la-une-aib","category-medias"],"jetpack_featured_media_url":"https:\/\/www.aib.media\/wp-content\/uploads\/2019\/05\/centrale-1.jpeg","jetpack_shortlink":"https:\/\/wp.me\/pavbHe-1wI","_links":{"self":[{"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/posts\/5872","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5872"}],"version-history":[{"count":0,"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/posts\/5872\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/media\/5873"}],"wp:attachment":[{"href":"https:\/\/www.aib.media\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5872"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5872"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5872"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}