{"id":13475,"date":"2020-03-03T20:13:26","date_gmt":"2020-03-03T20:13:26","guid":{"rendered":"https:\/\/www.aib.media\/?p=13475"},"modified":"2020-03-03T20:23:51","modified_gmt":"2020-03-03T20:23:51","slug":"burkina-10-milliards-et-demi-pour-revetir-la-route-ouaga-kongoussi-en-beton-bitumineux","status":"publish","type":"post","link":"https:\/\/www.aib.media\/?p=13475","title":{"rendered":"Burkina\u00a0: 10 milliards et demi pour rev\u00eatir la route Ouaga-Kongoussi en b\u00e9ton bitumineux"},"content":{"rendered":"<p><strong>Burkina-Routes-Entretien<\/strong><\/p>\n<p><strong>Burkina\u00a0: 10 milliards et demi pour rev\u00eatir la route Ouaga-Kongoussi en b\u00e9ton bitumineux<\/strong><\/p>\n<p><strong>Kongoussi, 3 mars 2020 (AIB)-Le Premier ministre burkinab\u00e8 Christophe Dabir\u00e9 a lanc\u00e9 mardi, les travaux de rev\u00eatement de la route Ouaga-Kongoussi (110km) qui co\u00fbteront 10 milliards 575 millions de FCFA pour un d\u00e9lai d\u2019ex\u00e9cution de 10 mois, a constat\u00e9 l\u2019AIB.<\/strong><\/p>\n<p>Le chef du gouvernement burkinab\u00e8 a lanc\u00e9 officiellement ce 3 mars 2020 \u00e0 Kongoussi, les travaux d\u2019entretien p\u00e9riodique de la route nationale 22 Ouagadougou-Kongoussi, longue de 110 km.<\/p>\n<p>Le co\u00fbt total de l\u2019entretien est de 10 milliards 575 millions 824 mille 981FCFA et le groupement d\u2019entreprise SOROUBAT\/BF et SOROUBAT \/CI a 10 mois pour ex\u00e9cuter le march\u00e9.<\/p>\n<p>Le financement est assur\u00e9 \u00e0 95% par la Banque Ouest Africaine de d\u00e9veloppement et 5% par l\u2019Etat burkinab\u00e8.<\/p>\n<p>Selon le ministre des Infrastructures Eric Bougma, les 110 km qui s\u00e9parent Kongoussi \u00e0 Ouagadougou vont \u00eatre rev\u00eatus de b\u00e9ton bitumineux.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"13479\" data-permalink=\"https:\/\/www.aib.media\/?attachment_id=13479\" data-orig-file=\"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r6.jpeg\" data-orig-size=\"899,600\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"r6\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r6.jpeg\" class=\"alignnone size-full wp-image-13479\" src=\"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r6.jpeg\" alt=\"\" width=\"899\" height=\"600\" srcset=\"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r6.jpeg 899w, https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r6-300x200.jpeg 300w, https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r6-768x513.jpeg 768w, https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r6-696x465.jpeg 696w, https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r6-629x420.jpeg 629w\" sizes=\"auto, (max-width: 899px) 100vw, 899px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>L\u2019objectif poursuivi par le gouvernement est de fluidifier le trafic sur l\u2019axe, d\u2019am\u00e9liorer la s\u00e9curit\u00e9 des usagers, d\u2019offrir de meilleures conditions de vie \u00e0 la population riveraine, de r\u00e9duire le temps de parcours et les co\u00fbts d\u2019exploitation des v\u00e9hicules, a-t-il ajout\u00e9.<\/p>\n<p>Le maire de Kongoussi Daouda Zorom\u00e9 a traduit la reconnaissance de la population au pr\u00e9sident du Faso Roch Marc Christian Kabor\u00e9 et au gouvernement burkinab\u00e8. Daouda Zorom\u00e9 a \u00e9galement souhait\u00e9 que les travaux d\u00e9butent \u00e0 Kongoussi pour soulager la peine des usagers de la province.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"13482\" data-permalink=\"https:\/\/www.aib.media\/?attachment_id=13482\" data-orig-file=\"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r1.jpeg\" data-orig-size=\"899,600\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;,&quot;orientation&quot;:&quot;0&quot;}\" data-image-title=\"r1\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r1.jpeg\" class=\"alignnone size-full wp-image-13482\" src=\"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r1.jpeg\" alt=\"\" width=\"899\" height=\"600\" srcset=\"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r1.jpeg 899w, https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r1-300x200.jpeg 300w, https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r1-768x513.jpeg 768w, https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r1-696x465.jpeg 696w, https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r1-629x420.jpeg 629w\" sizes=\"auto, (max-width: 899px) 100vw, 899px\" \/><\/p>\n<p>En marge de la c\u00e9r\u00e9monie, le Premier ministre Christophe Dabir\u00e9 s\u2019est rendu au site des d\u00e9plac\u00e9s internes de Lioudougou pour leur apporter un r\u00e9confort moral et 200 tonnes de vivres.<\/p>\n<p>En rappel, la route nationale 22 a \u00e9t\u00e9 bitum\u00e9e en 2007. Mais depuis 2016, la route a connu une forte d\u00e9gradation principalement entre le village de Malou et Kongoussi.<\/p>\n<p><strong>Agence d\u2019information du Burkina <\/strong><\/p>\n<p><strong>Asmado RABO<\/strong><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Burkina-Routes-Entretien Burkina\u00a0: 10 milliards et demi pour rev\u00eatir la route Ouaga-Kongoussi en b\u00e9ton bitumineux Kongoussi, 3 mars 2020 (AIB)-Le Premier ministre burkinab\u00e8 Christophe Dabir\u00e9 a lanc\u00e9 mardi, les travaux de rev\u00eatement de la route Ouaga-Kongoussi (110km) qui co\u00fbteront 10 milliards 575 millions de FCFA pour un d\u00e9lai d\u2019ex\u00e9cution de 10 mois, a constat\u00e9 l\u2019AIB. Le [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":13477,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","footnotes":"","jetpack_post_was_ever_published":false},"categories":[173,37,93,203,83],"tags":[],"class_list":["post-13475","post","type-post","status-publish","format-standard","has-post-thumbnail","category-depeches","category-economie","category-flashinfos","category-la-une-aib","category-medias"],"jetpack_featured_media_url":"https:\/\/www.aib.media\/wp-content\/uploads\/2020\/03\/r7.jpeg","jetpack_shortlink":"https:\/\/wp.me\/pavbHe-3vl","_links":{"self":[{"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/posts\/13475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13475"}],"version-history":[{"count":0,"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/posts\/13475\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=\/wp\/v2\/media\/13477"}],"wp:attachment":[{"href":"https:\/\/www.aib.media\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aib.media\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}